Tampa Precision Concrete pours pool decks, waterfront patios, driveways, walkways and slabs for Apollo Beach homeowners, from the original canal streets off Apollo Beach Boulevard to newer communities like MiraBay and Waterset.
Apollo Beach nearly doubled between censuses, going from 14,055 residents in 2010 to 26,002 in 2020. Much of the original community was built along an estimated 55 miles of dredged canals that open to Tampa Bay, which puts a lot of concrete within a few feet of salt water and inside FEMA coastal flood zones.
We plan every job here around water: the bay, the canals and the summer storms. When you need work done farther north in Lutz, our crews cover that side of the county as well.
Most of what makes Apollo Beach different comes back to the canals. The canal system took shape after Francis Corr bought the land in 1957 and named it Apollo Beach the next year, and the houses that line them sit low, close to the water and exposed to salt.
The classic Apollo Beach request is a patio that stretches from the lanai to the seawall cap. We leave a joint where our slab meets the cap so the two structures can move separately, and we slope the patio gently toward the canal or a side drain so rain does not pool against the house.
Seawall repair itself is marine construction and belongs to a licensed marine contractor. If your cap is cracked or the wall is leaning, get that addressed first, because a new patio poured behind a failing wall will follow it.
Salt spray off the bay speeds up surface scaling and attacks any steel that sits too close to the surface. We keep reinforcement well covered, finish the surface tight and recommend a penetrating sealer on waterfront slabs, renewed every few years.
Hillsborough County adopted new coastal flood maps on October 7, 2021, the first coastal update in more than 30 years. Plenty of waterfront parcels here sit in high-risk A or V zones, so check your zone before planning anything at ground level.
In September 2024, Helene pushed storm surge into the canal neighborhoods, and some longtime residents who had ridden out earlier storms evacuated for Milton two weeks later. Concrete itself handles brief flooding well, but undermined edges and washed-out base material show up for months afterward.
After a surge event we look for hollow-sounding slabs, edges with sand missing underneath and walkways that have dropped. A sound panel can often be lifted with concrete leveling, while a cracked and undermined one is cheaper to replace than to chase.
Recent construction near the water often sits higher to meet flood rules, which leaves more exposed concrete at grade: entry steps, parking areas and slabs under the living space. We pour those to drain freely and avoid trapping water against stem walls or stairs.
Pools are standard on Apollo Beach waterfront lots, and the deck takes more abuse here than inland: sun, salt, chlorine splash and the occasional flood.
A knockdown finish gives bare feet some grip and reflects heat better than a smooth trowel. A 600 square foot pool deck with knockdown typically runs $5,400 to $8,400, depending on access and how much old deck has to come out first.
Many canal houses have little side-yard room, so getting concrete to the back means a pump truck or a line of wheelbarrows. We work that out at the estimate so the price you see includes it.
The front of an Apollo Beach home matters too, especially with newer associations setting finish and color rules. Many of the communities east of US 41 toward I-75 and Big Bend Road are recent builds, while the original canal streets sit between US 41 and the bay.
A two-car driveway generally costs $4,000 to $6,500. On the older canal streets, original driveways are often thin and cracked, and tear-out adds $2 to $5 per square foot.
MiraBay, Waterset and many other Apollo Beach neighborhoods have architectural review. We supply the drawing, finish sample and color for your application and wait for approval before scheduling.
The questions we hear most along the bay.
Apollo Beach is unincorporated Hillsborough County. Driveway work that reaches the road needs a county right-of-way permit, and we pull it for you.
Not if it is built right and sealed. Good concrete placed at the right thickness, with steel properly covered and a sealer maintained over time, holds up well near the bay.
Spring and fall are the busiest months. Booking a few weeks out lets us pull permits, get HOA approval and plan around summer rain or an approaching storm.
Usually not. Raising a patio closer to the door threshold invites water inside during heavy rain or surge. We keep the slab below the interior floor and pitch it away from the house, and if your lot is low we talk about drains or a swale instead of building up.
